Weekly Bloomfield Main Street rehabilitation report: April 10 – 16

April 10, 2026

April 10, 2026

The County of Prince Edward is rehabilitating Bloomfield Main Street from Corey Street to Wellington Street.

The municipality is providing the following project updates:

  • All but two sections of underground storm sewers have been replaced at this time.
  • Over the past five days, the contractor continued to remove curbs requiring replacement.
  • Most sidewalk panels marked for replacement have been left in place for now to limit disruption.
  • Staff identified the maintenance of gravel road cuts for storm sewer replacement as a potential issue. Staff and the contractor will closely monitor the condition of the gravel road cuts and undertake repairs if required.

The project remains on schedule with work slated to be completed by mid-June 2026.

The following work is scheduled to take place from April 13 – 17:

  • Underground utility confirmation via vacuum excavation (also known as hydro vac) at the intersection of Stanley Street on Monday, April 13. This work may result in minor traffic disruptions and elevated noise levels.
  • The final two sections of storm sewer located at Stanley Street and Wellington Street will be replaced.
  • All remaining sections of curb and sidewalk will be removed.

Single lane closures in the active work zone will continue.

Driveways may be temporarily blocked during work. The contractor will provide advance notification to residents and businesses directly impacted by temporary driveway blockages.

The municipality will provide weekly updates every Friday throughout the project. Visit the County website and sign up to receive these updates in your inbox.

The municipality is resurfacing Bloomfield Main Street from Corey Street to Wellington Street in 2026. The project will also include line painting, storm sewer repairs, and concrete curb and sidewalk repairs. Learn more about the project.

If you have any questions or concerns, contact Garrett Osborne, Project Manager, at gosborne@pecounty.on.ca or call 613.476.2148 extension 2002.

Share This:
Share
Tweet
Save

Related News & Notices

Weekly Bloomfield Main Street rehabilitation report: April 10 – 16

Traffic disruptions on Fairfield Avenue (Picton) April 13

Glide into spring with free public skating

Community wide Earth Day events set for Prince Edward County

Learn more about Outlet Bridge rehabilitation at public information centre April 23

Watermain flushing and hydrant maintenance in Picton to begin April 13