Road surface crack sealing work begins June 8

Crack sealing work on various road surfaces is underway on several County roads.

The municipality has retained a contractor to complete the work, which may result in minor traffic disruptions, including single lane closures. The work is expected to take approximately two weeks to complete, weather permitting.

  • Work is expected to take place Monday to Friday between 7 am and 7 pm.
  • Traffic control will be in place where required. Work at signalized intersections may require additional traffic control measures, including paid duty officers, depending on operational requirements and availability.
  • Work will take place on the following roads:
 

Road Name

Area NameLocation DescriptionApprox.

Section Length

County Road 10Athol / South Marysburgh1764 County Road 10 to 2815 County Road 105 km
County Road 33

(Picton Main Street)

PictonWalton Street to Cold Storage Road1 km
West Mary StreetPictonOntario Street to Ferguson Street0.3 km
Ferguson StreetPictonPicton Main Street to Prospect Avenue0.4 km
Grove StreetPictonProspect Avenue to Ontario Street0.1 km
Prospect AvenuePictonGrove Street to End0.5 km
South StreetPictonOntario Street to Spring Street0.2 km
James AvenuePictonSpring Street to Lake Street0.1 km
Elizabeth StreetPictonPicton Main Street to Mary Street0.1 km
King StreetPictonWalton Street to Paul Street0.6 km
Queen StreetPictonDownes Avenue to Johnson Street0.8 km
Centre StreetPictonKing Street to Century Drive0.6 km
Jane StreetPictonPaul Street to Johnson Street0.2 km
Johnson StreetPictonCounty Road 49 to Barker Street0.5 km
Gladstone StreetPictonJohnson Street to End0.2 km
Maple AvenuePictonCounty Road 49 to Gladstone Street0.2 km

Note: All locations may not be completed in 2026.

  • Equipment may limit visibility in the area and noise levels will be elevated for the duration of the repair.
  • Crack sealing is a preventative maintenance technique to prevent the intrusion of water and debris into existing cracks, protecting the road from further deterioration and extending the lifespan of the road.
  • Visit the County website to learn more about crack sealing and the road rehabilitation and preventative maintenance program.
  • For more information, contact the County of Prince Edward at 613.476.2148 extension 1023, 613.962.9108 extension 1023 or info@pecounty.on.ca.

Please note: The County of Prince Edward provides this information as a service to the general public. While we do our best to provide accurate information, construction projects and associated service disruptions are subject to change based on weather, road, traffic, and other uncontrollable conditions.

Share This:
Share
Tweet
Save

Related News & Notices

Consecon Street at Millennium Trail intersection closed for paving work November 25

Traffic disruptions in Picton November 29 for Santa Claus Parade

Picton Main Street reconstruction to continue through winter months

Traffic disruptions in Bloomfield November 27 for Santa Claus Parade

Sidewalk and culvert repairs over Lane Creek (Wellington) rescheduled to begin November 30

County Road 49 rehabilitation report: November 23 – 27