Prince Edward County Municipal Services

Business

Find the info you need on relocating, starting or expanding your business in Prince Edward County.

Visit

Explore what Prince Edward County has to offer for residents and visitors alike.

 

 

County resolving issue with excess soil on Millennium Trail in Wellington

July 30, 2026

The County of Prince Edward and its contractor will reduce the elevation of the Millennium Trail between Wharf Street and Maple Street in Wellington.

Some of the excess soil from the Wellington Trunk Watermain and Sanitary Sewer project was reused on that section of the trail. However, the trail was constructed at a substantially higher elevation than planned in the approved design.

To rectify the situation, the municipality will remove more than half of the existing soil. This change will result in a maximum embankment height of approximately 750 mm (30 inches) with 3:1 (horizontal to vertical) side slopes, significantly improving the final trail profile.

The trail between Wharf and Maple streets will be graded to create a more gradual transition that is less noticeable to trail users while maintaining accessibility. Grading transitions will be limited to a maximum grade of 2.5%, which is half of the maximum 5% grade permitted under accessibility standards.

Some soil will be used in a low area near Cleminson Street. Placing material in this location will level the existing trail profile rather than create a raised embankment.

Work to restore this section of the trail is currently underway.

Any remaining material that cannot be reused on-site will be transported to the contractor’s stockpile area while staff continue to evaluate other suitable reuse opportunities along the Millennium Trail. If no appropriate reuse location is identified, the remaining material will be transported to a private designated reuse facility.

If you have questions regarding this work, please contact Chris Timpson, Project Manager, at 613.476.2148 extension 2035 or email ctimpson@pecounty.on.ca.

Share This:
Share
Tweet
Save

Related News & Notices

North Marysburgh Hall water system installation to begin August 17

Treatment application begins August 17 to control invasive plant species

Construction on Highway 33, Loyalist Parkway, August 13

Have your say on County services

Glenora Ferry returns to regular service

County Road 49 rehabilitation report: August 10 – 14