NPL Canada will be installing a new natural gas service connection at 1350 and 1724 County Road 10 on Friday, October 9.
- Work will take place from 7 am to 7 pm.
- Traffic disruptions and lane restrictions are expected. Excavation work will take place within the Municipal Right-of-Way (ROW). The ROW extends from the edge of the roadway to the property line.
- Traffic control will be in place. Motorists are asked to approach the site with caution or avoid the construction area if possible.
- Heavy equipment will limit visibility in the area and noise levels will be elevated for the duration of the work.
- For more information, contact the County of Prince Edward at 613.476.2148 extension 1023, 613.962.9108 extension 1023, or info@pecounty.on.ca.
Please note: The County of Prince Edward provides this information as a service to the general public. While we do our best to provide accurate information, construction projects and associated service disruptions are subject to change based on weather, road, traffic, and other uncontrollable conditions.

