The Corporation of the County of Prince Edward has retained Jewell Engineering to complete the design for the rehabilitation of a section of County Road 3. The project scope includes ditching improvements, culvert replacements, paved shoulders and full removal and replacement of the existing roadway asphalt
surface. This project begins where the previous phase of the County Road 3 rehabilitation ended (civic #1460) and continues to the west for approximately 1.1 km (civic #1668). The design for the rehabilitation of County Road 3 is being completed as an ‘Exempt’ undertaking in accordance with the Municipal Class Environmental Assessment (MCEA), which applies to municipal infrastructure projects including roads, bridges, water, and wastewater projects; however, the County is providing design and construction related information through a public information centre in advance of the work. The road rehabilitation is anticipated to be completed in 2026 (May/June to September), pending funding and approvals, and a minimum of one lane of traffic is anticipated to be maintained throughout the duration of the work.
A Public Information Centre is being held to provide additional information and identify the nature of the work, as well as answer any questions regarding the project.
Date: April 22, 2026
Time: 6 pm – 8 pm
Location: Ameliasburgh Town Hall – 13 Coleman Street, Ameliasburgh
The PIC will consist of a drop-in type format with displays showing the recommended plan for the road rehabilitation. Staff from the County and the Project Consultant will be on hand to answer any questions.
If you have any questions, please contact the County or the Project Consultant below.
Pat Schick, A.Sc.T.
Consultant Project Manager
Jewell Engineering
Belleville, ON
(613) 969-1111
pat@jewelleng.ca
Mr. Garrett Osborne, C.E.T., PMP
Project Manager
The County of Prince Edward
280 Picton Main Street
Picton, ON K0K 2T0
(613) 476-2148 ext. 2002
gosborne@pecounty.on.ca
All comments will be collected and maintained on file for use in this project and will become part of the public record in accordance with the Municipal Freedom of Information and Protection of Privacy Act. With the exception of personal information, all comments may be included in project documentation and made available to the public. If you have any accessibility or accommodation requirements in order to participate in this project, please contact one of the project team members listed above.